This letter is to give reference for work carried out by the above company on equipment both directly and indirectly under my control. All work was carried out to a good standard including safety aspects, quality of people and the work undertaken. The acceptance and interface with our systems was complied with on all projects. Projects include re-heat furnace sub structure fabrication & installation, piling machine structure fabrication & replacement and general mechanical maintenance work. Work was carried out on time and within budget.
08.03.2012: Furnace & Piling Machine
08.03.2012: Furnace & Piling Machine Area Manager Engineering